Filing obligations start the day you distribute · Rules library last reviewed September 19, 2026 · Every rule linked to its official source
Fertilabel / Fee calculator

What will the tonnage report cost you?

Pick a state, enter the tons you distributed in the reporting period, and this works out the inspection fee from the rate that state actually publishes — minimums, surcharges and all. Free, no sign-up, and every figure links to its source.

Inspection fee calculator · 50 states

What this does and does not include

This is the inspection fee — the per-ton amount that goes with the tonnage report. It does not include the licence, product registration or renewal fees, which are fixed amounts per year and are listed on each state page. It also assumes standard fertilizer: some states price lime, phosphatic materials or bulk distribution differently, and those exceptions are noted on the state page.

Where a state does not charge by the ton, or where we have not been able to confirm the rate in an official source, this calculator says so instead of showing a number. That is deliberate.

This is one state. You probably sell in twelve

Fertilabel does this for every state you distribute in, on the right date, with the form already filled in.

Join early access →

Where these rates come from

Each rate is read from the state's statute or its agency's own fee page, with the date we last checked it. Open any state page to see the source behind the number, or read how we verify.